Kafe Dostoyevsky callouts & defender setups
Ranked pool Layout: Y11S2 54 callouts
A tall three-floor building where the red, white and main staircases carry almost every rotation. Both second-floor sites include Fireplace Hall, so the same central room has to be held in two very different ways depending on the objective.
Bombsites
Floor plan and callouts
Draft layout. Room positions on this Kafe Dostoyevsky plan are a rough approximation and have not been checked in-game yet. Room names and the site breakdown are accurate; treat the shapes and distances as a sketch.
Hatches are marked in amber. Drill these rooms in the trainer.
Every callout on Kafe Dostoyevsky
Names follow community convention rather than any one site's wording, and were cross-checked against multiple community references. Where a room is commonly called two things, both are listed and both count as correct in the trainer. How this content is sourced and kept current.
1st Floor
- VIP Corridor
- Garage
- Bakery
- Prep
- Cooking
- Service
- Freezer
- White Stairs
- VIP
- Bottom Bar
- Restaurant
- Small Bakery
- Red Stairs
- Coat
- Reception
- Wood Stairs
- Bakery Corridor
2nd Floor
- Bakery Roof
- Train
- Dining
- Reading Corridor
- White Stairs
- Laundry
- Reading
- Mining
- Mining Corridor
- Pillar
- Red Corridor
- Red Stairs
- Fireplace
- Wood Stairs
- Main
- Terrace<br/>Entrance
3rd Floor
- Bakery Roof
- Piano
- White Corridor
- White Stairs
- Bathroom
- Bar<br/>Freezer
- Cocktail Entrance
- Cocktail
- Storage
- Cigar
- Bar
- Red Stairs
- Cigar Balcony
- Cocktail Balcony
- Wood Stairs